Guide for Exhibition

Booth fee

기술지원 설명
Standard Booth KRW 1,650,000// 1 booth (included vat)
Utility included in standard booth Side & rear walls , carpet (pytex) company name sign board ,1 fluorescent light(40w) and 2 spotlights(100w) , 1 information desk and 1 chair , 1 socket (15A / 220V)
Size 3m(w)×3m(d)×3.2 m(h)
Raw booth (Space Only) KRW 1.320.000 / 1 booth ( included vat)
3m(w)×3m(d) , we provide only sites for booths
Minimum units for Space Only Booth : 2 or more booths. (Exhibitors who apply for more than 8 booths must consult with the organizer )
Exhibitors are recommended construct their booth using a bexco appointed contractor
(if you construct in person , you must consult with the Organizer)
Utility service lighting SPOT KRW 15,000 / unit
HQI KRW 50,000 / unit
Electricity 220V single-phase KRW 55,000 / kw
220v three-phase KRW 55,000 / kw
380V three-phase KRW 55,000 / kw
220v single-phase (24 hours) KRW 77,000 / kw
Internet cable KRW 165,000 /port
water supply KRW 220,000 /unit

Electricity

  • 1 KW of electricity is supplied per a Standard Booth. If additional electricity is needed, exhibitors shall apply for additional electric supply
  • Raw booth(space only) does not contain any electricity therefore exhibitors are responsible to apply electricity in individual
  • Check the power requirements of the exhibits and apply for the proper amount of electricity.
  • When you apply electricity you must revalue the amount of electrical power.
  • Exhibitors requiring another voltage might need install a transformer at their own expense.
  • For exhibitions requiring 24 hours of electricity supply, please apply for electricity for 24 hours separately.
  • Any electrical work in the exhibitor is prohibited. All related work should be done through a bexco-designated electrician
    ※ the phase in electricity is differ according to the product so you must consult with the organizer

Water supply

  • Organizer install only plumbing so Exhibitor shall work the rest with contractor companies registered by bexco
  • If Exhibitors install plumbing personally, Organizer is not responsible of the damage
  • If exhibitors use water supply and need water tap, organizer will provide for free .

Internet

  • Exhibitors who need internet shall apply for internet in advance
  • For more information , check the registration form please

[NOTICE]

  1. All utility service can be applied by email.
  2. For smooth operation, apply until 2023.08.11(Fri)
  3. Utility service shall be supplied after 2023.08.31 (Thu) 10:00 (It can be changed by organizer’s situation )
  4. Electric Power shall be supplied from 10:00(open) until 18:30(closing) during the show period